Finishing and fit-out contracting in Riyadh
From the structure to a space ready for use: finishing works with one coordination and a clear programme.
We are based in Riyadh. We discuss projects across the Kingdom according to their location and scope.

What the work covers
Plaster and ceilings
Suspended ceilings, partitions and plaster details with light positions prepared.
Paint and wall treatments
Surface preparation, paint, wallcoverings and special finishes.
Floors
Tile, porcelain, marble, parquet and epoxy floors to suit the use.
Doors and joinery
Doors, wardrobes, kitchen units and timber details.
Related works
We arrange the electrical and plumbing works tied to the finishing with the relevant trades.
Cleaning and handover
Final clean, snag list and documented handover.
How we work
- 1
Survey and quantities
We visit the site and measure the items and quantities.
- 2
Programme and materials
We agree a schedule, materials and specifications with you before starting.
- 3
Supervision and handover
We supervise on site and hand over with a snag list.
What you receive
- An itemised quote with quantities
- A works programme
- Approved material specifications
- A documented handover with snag list
Common questions
How long do the works take?
It depends on the area and scope. We state the duration in the quote after the survey.
Do you handle electrical and low-current work?
We coordinate it with the finishing. Low-current systems are carried out by our other division within the same plan.
Do you do interior fit-out in Riyadh for villas and offices?
Yes, interior fit-out and finishing for villas, apartments, offices and shops in Riyadh, from plaster, paint and floors to handover, with a clear programme and itemised scope.
How is price per metre worked out for a turnkey villa finish?
We do not give a fixed per-metre figure because the level of materials and detail changes it a lot. After the survey we list your villa's items and quote by item and quantity.
Can finishing be done in stages?
Yes, and the order of works is coordinated so finished work is not broken for system cabling.